+974 44421821 Sat - Thu 08:00 - 18:00
+974 44421821 Sat - Thu 08:00 - 18:00
#1 GEOSYNTHETICS
SUPPLIER IN QATAR
GW330
TRAINED & CERTIFIED
GET A QUOTE

Welding Concrete Protection Liner with Leister

SKILLSCONCRETE PROTECTION LINING, PLASTIC WELDING
PRODUCTSLEISTER ASTRO, LEISTER FUSION 3, AGRU CONCRETE PROTECTIVE SHEET 33,000 m2, 3 mm, PE100
LOCATIONLUSAIL, QATAR
SECTORWATER

Welding Concrete Protection Liner with Leister

QEMS are carrying out the concrete protective lining of massive tanks currently being built in Doha, Qatar. They each have a capacity of 150,000 m3 and will later supply the pre-planned town of Lusail with valuable potable water.

To protect the poured concrete foundation which is at risk of corrosion from saline groundwater, special focus is placed on the sealant system. To this end, a special protective layer made of PE is inserted. On the side filled with concrete, nubs ensure that the protective layer is optimally anchored.

 

The difficulty when connecting the individual sheets in the protective liner is welding them rationally. Leister Technologies AG has developed a special automatic welder for this. The tried and tested hot wedge welder ASTRO was retrofit- ted so it runs smoothly between the nubs and can weld the overlapping sheets. The ASTRO CPL (Concrete Protection Liner) runs at 1.5 to 2 meters per minute over the 3 mm thick PE sheets. It connects the stiff PE material with its maximum contact pressure of 1500 N securely and without problems.